Annual Report (or Report) of the Secretary of War, Svazek 2,Díl 4U.S. Government Printing Office, 1902 |
Vyhledávání v knize
Výsledky 1-5 z 100
Strana 2576
United States. War Department. the channel in that portion of the river extending north from Fox Point . ( The United States has not improved this portion of the river . ) The city of Providence has expended during the period from and ...
United States. War Department. the channel in that portion of the river extending north from Fox Point . ( The United States has not improved this portion of the river . ) The city of Providence has expended during the period from and ...
Strana 2577
... United States and includes a navigable channel 200 feet wide , 12 feet deep , and about 3,000 feet long , dredged by the United States , distant 200 to 400 feet from dock fronts . Mystic River at Noank and Mystic , Conn . - The river at ...
... United States and includes a navigable channel 200 feet wide , 12 feet deep , and about 3,000 feet long , dredged by the United States , distant 200 to 400 feet from dock fronts . Mystic River at Noank and Mystic , Conn . - The river at ...
Strana 2578
United States. War Department. between May 20 and 31 , and at Hartford lower bar between June 21 and 28. It is reported that about 17,500 yards were removed . Branford Harbor , Connecticut . - Private dredging has been done in times past ...
United States. War Department. between May 20 and 31 , and at Hartford lower bar between June 21 and 28. It is reported that about 17,500 yards were removed . Branford Harbor , Connecticut . - Private dredging has been done in times past ...
Strana 2580
United States. War Department. line , and aggregate about one - half mile in length . About 600 feet of the upper end of the east branch of the channel and the whole of the west branch , about 550 feet , are adjacent to wharves or where ...
United States. War Department. line , and aggregate about one - half mile in length . About 600 feet of the upper end of the east branch of the channel and the whole of the west branch , about 550 feet , are adjacent to wharves or where ...
Strana 2581
United States. War Department. Of the improvements which have been or are to be made by the United States , under approved projects , about 2,200 feet of the dredged channel and the whole of the basin in the West Branch and nearly a mile ...
United States. War Department. Of the improvements which have been or are to be made by the United States , under approved projects , about 2,200 feet of the dredged channel and the whole of the basin in the West Branch and nearly a mile ...
Další vydání - Zobrazit všechny
Annual Report (or Report) of the Secretary of War, Díl 2 United States. War Department Úplné zobrazení - 1869 |
Běžně se vyskytující výrazy a sousloví
amount appropriated approved August authorized azimuth Back azimuth bridge built canal channel Chief of Engineers Clair Clair River completed construction Continuing improvement contract corner of section corporation Corps of Engineers Creek cubic yards depth Detroit River dikes discharge district dredging East East Base ENGINEER OFFICE expended feet wide foot G. L. GILLESPIE gauge Geodetic hereby House Document Numbered hundred Huron Improving harbor inches Island July June 30 Lake Huron Lake Michigan Lake Superior Latitude length lengths-Continued light-house linear feet Lock longitude maintenance Marys River ment mile Mississippi Mississippi River mouth navigation October Oswego Park piers Point Provided Proviso railroad companies Railway Company repair reservoir road Secretary Secretary of War shore line side South span station street submitted in House survey Table of positions thereof thousand dollars tion triangulation Washington Washington Aqueduct West Base wharves