Annual Report (or Report) of the Secretary of War, Svazek 2,Díl 4U.S. Government Printing Office, 1902 |
Vyhledávání v knize
Výsledky 1-5 z 100
Strana 2610
... Station , Mont . Right bank of river near 5 dikes aggregating 1,115 $ 9 , 373.66 . Colgate Station , Mont . feet in length . Constructed by- Location . Character of work . Extent of. Exhibit of improvements on Yellowstone River , in ...
... Station , Mont . Right bank of river near 5 dikes aggregating 1,115 $ 9 , 373.66 . Colgate Station , Mont . feet in length . Constructed by- Location . Character of work . Extent of. Exhibit of improvements on Yellowstone River , in ...
Strana 2614
... Station , Mo. of Not known . stone , covering about 100 linear feet of bank . Three - fourths of a mile . $ 23,000 .. On left bank , below railway station at Parkville , Mo. Shore protection : 500 linear feet . Stone riprapping $ 1,000 ...
... Station , Mo. of Not known . stone , covering about 100 linear feet of bank . Three - fourths of a mile . $ 23,000 .. On left bank , below railway station at Parkville , Mo. Shore protection : 500 linear feet . Stone riprapping $ 1,000 ...
Strana 2631
... station , is still maintained by the Government , while the main- tenance of the inner 670 feet devolves upon the owners of the property in its rear . The west pier , as originally constructed by the Govern- ment , has a length of 2,157 ...
... station , is still maintained by the Government , while the main- tenance of the inner 670 feet devolves upon the owners of the property in its rear . The west pier , as originally constructed by the Govern- ment , has a length of 2,157 ...
Strana 2633
... station . The south pier has a total length of 5,774 feet and projects 1,770 feet beyond the shore line . The length of the portion inside of the shore line is 4,004 feet . The necessary dredging for the maintenance of navigation at the ...
... station . The south pier has a total length of 5,774 feet and projects 1,770 feet beyond the shore line . The length of the portion inside of the shore line is 4,004 feet . The necessary dredging for the maintenance of navigation at the ...
Strana 2634
... station . The south pier as built by the Government has a total length of 1,847 feet and projects 600 feet beyond the shore line . The easterly exten- sion of the south pier to Pentwater Lake , built by the Chicago and West Michigan ...
... station . The south pier as built by the Government has a total length of 1,847 feet and projects 600 feet beyond the shore line . The easterly exten- sion of the south pier to Pentwater Lake , built by the Chicago and West Michigan ...
Další vydání - Zobrazit všechny
Annual Report (or Report) of the Secretary of War, Díl 2 United States. War Department Úplné zobrazení - 1869 |
Běžně se vyskytující výrazy a sousloví
amount appropriated approved August authorized azimuth Back azimuth bridge built canal channel Chief of Engineers Clair Clair River completed construction Continuing improvement contract corner of section corporation Corps of Engineers Creek cubic yards depth Detroit River dikes discharge district dredging East East Base ENGINEER OFFICE expended feet wide foot G. L. GILLESPIE gauge Geodetic hereby House Document Numbered hundred Huron Improving harbor inches Island July June 30 Lake Huron Lake Michigan Lake Superior Latitude length lengths-Continued light-house linear feet Lock longitude maintenance Marys River ment mile Mississippi Mississippi River mouth navigation October Oswego Park piers Point Provided Proviso railroad companies Railway Company repair reservoir road Secretary Secretary of War shore line side South span station street submitted in House survey Table of positions thereof thousand dollars tion triangulation Washington Washington Aqueduct West Base wharves