... QUANTITIES . All bids will be compared on the basis of the Engineer's estimate of quantities of work to be done , as follows : Item 1 . Removing stone block pavement , Item 2. - Laying 8 - inch vitrified pipe , Item 3. - Laying 10 ...
... QUANTITIES . All bids will be compared on the basis of the Engineer's estimate of quantities of work to be done , as follows : Item 1 . Removing stone block pavement , Item 2. - Laying 8 - inch vitrified pipe , Item 3. - Laying 10 ...
Strana 14
... quantity , quality , acceptability , fitness and rate of progress of the several kinds of work and materials to be performed and furnished under this contract , and shall decide all questions which may arise as to the fulfilment of this ...
... quantity , quality , acceptability , fitness and rate of progress of the several kinds of work and materials to be performed and furnished under this contract , and shall decide all questions which may arise as to the fulfilment of this ...
Strana 27
... quantity , which shall be raked or swept until the joints are entirely filled with it . At each catch - basin the Contractor shall set , at the proper grade , a cast - iron catch - basin frame and cover , which will be furnished near ...
... quantity , which shall be raked or swept until the joints are entirely filled with it . At each catch - basin the Contractor shall set , at the proper grade , a cast - iron catch - basin frame and cover , which will be furnished near ...
Strana 28
... quantity to take up any sur- plus of the bituminous binder which may remain on the sur- face , and the whole shall then be finished by rolling until it is thoroughly compacted . The quantities of bituminous binder stated above are only ...
... quantity to take up any sur- plus of the bituminous binder which may remain on the sur- face , and the whole shall then be finished by rolling until it is thoroughly compacted . The quantities of bituminous binder stated above are only ...
Strana 31
... quantity of lampblack ; when finished it shall be even and true to the required form and equal in appear- ance to the best granolithic work . This surfacing shall be applied within one hour after the placing of the concrete . The ...
... quantity of lampblack ; when finished it shall be even and true to the required form and equal in appear- ance to the best granolithic work . This surfacing shall be applied within one hour after the placing of the concrete . The ...
Běžně se vyskytující výrazy a sousloví
10-inch vitrified pipe 2-inch fibre conduits 8-inch vitrified aforesaid agents amount approved binding gravel bituminous binder Boston Embankment BOYLSTON STREET cast-iron pipe certified check Charles River Basin city of Boston Commis Commonwealth of Massachusetts compacted completion concrete contract Contractor damage defective employees Engineer estimate excavating expenses finished grade frames and covers granite edgestones granolithic walks inches incidental thereto include the cost Item 12 joints jute labor and materials laying 2-inch fibre linear foot lines and grades loam surfacing lost or injured manholes Measurement and price ment mortar necessary paid payment place in roadway place in walks plans Portland cement price hereinafter agreed proposed quantity rammed removing stone block River Basin Commission rolled rollers round holes safe keeping sand SECT service boxes shown sion specified square yard stone block pavement stone in place subgrade SURFACING SECTION thereof tractor valves vitrified brick gutters walks and roadway
Oblíbené pasáže
Strana 46 - ... or any part thereof, and in case such expense is less than the sum which would have been payable under this contract, if the same had been completed by said contractor, then the said party of the second part shall be entitled to receive the difference...
Strana 5 - Works does not, expressly or by implication, agree that the actual amount of work will correspond therewith, but reserves the right to increase or decrease the amount of any class or portion of the work, or to omit portions of the work, as may be deemed necessary or advisable by the Engineer.
Strana 45 - ... that the said work, or any part thereof, Is unnecessarily or unreasonably delayed, or that the Contractor is...
Strana 15 - ... shall be a condition precedent to the right of the contractor to receive any money under this contract.
Strana 45 - Commissioners, that the said work or any part thereof is unnecessarily or unreasonably delayed, or that the...
Strana 44 - ... and their officers and agents, from all claims relating to labor and materials furnished for the work; to inventions, patents and patent rights used in doing the work; to injuries to any person or corporation received or sustained by or from the Contractor...
Strana 48 - ... for all loss or damage arising out of the nature of the work aforesaid, or from the action of the elements, or from any unforeseen...
Strana 44 - ... file with the Engineer an itemized statement of the details and amount of such work or damage...