" Officer in writing of: (1) subsurface or latent physical conditions at the site differing materially from those indicated in this contract, or (2) unknown physical conditions at the site, of an unusual nature, differing materially from those ordinarily... "
Cases Decided in the Court of Claims of the United States - Strana 112
autor/autoři: United States. Court of Claims - 1946
Úplné zobrazení - Podrobnosti o knize

Cases Decided in the Court of Claims of the United States, Svazek 111

United States. Court of Claims - 1948 - 886 str.
...the work given in drawings or specifications has been obtained by Government representatives * * * : Should the Contractor encounter, or the Government discover, during the progress of the work, subsurface or latent conditions at the site materially differing from those shown on the drawings or...
Úplné zobrazení - Podrobnosti o knize

Decisions of the Comptroller General of the United States, Svazek 8

United States. General Accounting Office - 1929 - 804 str.
...and the contact shall be modified in writing accordingly," while article 4 of the contract provides: Should the contractor encounter, or the Government discover, during the progress of the work, subsurface and (or) Intent conditions at the siie materially differing from those shown on the drawings...
Úplné zobrazení - Podrobnosti o knize

Specifications, Schedule, and Drawings: Hoover Dam, Power Plant and ...

United States. Bureau of Reclamation - 1930 - 132 str.
...contractor from proceeding with the prosecution of the work so changed. ARTICLE 4. Changed conditions. — Should the contractor encounter, or the Government discover, during the progress of the work, subsurface and (or) latent conditions at the site materially differing from those shown on tho drawings...
Úplné zobrazení - Podrobnosti o knize

Hearings Before Committee on Naval Affairs of the House of Representatives ...

United States. Congress. House. Committee on Naval Affairs - 1930 - 1642 str.
...reasonable amount. Article 4 of the contract reads as follows : ASTICLE 4. Changed conditions. — Should the contractor encounter, or the government discover, during the progress of the work subsurface and (or) latent, S9380-28— No. 25 (71) 72 conditions at the site materially differing...
Úplné zobrazení - Podrobnosti o knize

The Construction of Hoover Dam: Preliminary Investigations, Design of Dam ...

United States. Department of the Interior, Ray Lyman Wilbur, Elwood Mead - 1933 - 338 str.
...contractor from proceeding with the prosecution of the work so changed. ART. 4. Changed conditions. — Should the contractor encounter, or the Government discover; during the progress of the work, subsurface and (or) latent conditions at the site materially differing from those shown on the drawings...
Úplné zobrazení - Podrobnosti o knize

Orders and Regulations, Corps of Engineers, U.S. Army, 1934

United States. Army. Corps of Engineers - 1934 - 396 str.
...site materially differing from *;:ose shown on the drawings or indicated in the specifications, or unknown conditions of an unusual nature differing,...ordinarily encountered and generally recognized as being inherent in work of the character provided for in the plans and specifications, the Deputy Contracting...
Úplné zobrazení - Podrobnosti o knize

Taking the Profits Out of War: Hearings Before the Committee on Military ...

United States. Congress. House. Committee on Military Affairs - 1935 - 812 str.
...contractor from proceeding with the prosecution of the work so changed. ARTICLE 4. Chanffed eonditwng. — Should the contractor encounter, or the Government discover, during the progress of the work, subsurface and (or) latent 113668 — '" »' conditions at the site materially differing from those...
Úplné zobrazení - Podrobnosti o knize

Taking the Profits Out of War: Hearings Before the Committee on Military ...

United States. Congress. House. Committee on Military Affairs - 1935 - 990 str.
...from proceeding with the prosecution of the work so changed. Awn-rOLE 4¿ Changed eonditioas.—Should the contractor encounter, or the Government discover, during the progress of the work, subsurface and (or) latent 11 3666—'¿---——1 I conditions at the site materially differing from...
Úplné zobrazení - Podrobnosti o knize

The Code of Federal Regulations of the United States of America ..., Kniha 2

1939 - 1306 str.
...contractor from proceeding with the prosecution of the work so changed. AST. 4. Changed conditions. Should the contractor encounter, or the Government discover, during the progress of the work subsurface and/or latent conditions at the site materially differing from those shown on the drawings...
Úplné zobrazení - Podrobnosti o knize

Specifications for Construction of Roads and Bridges in National Forests and ...

United States. Bureau of Public Roads, United States. Public Roads Administration - 1941 - 550 str.
...conditions at the site," as used in article 4 of Form 23 shall be construed to mean and to refer solely to conditions of an unusual nature differing materially...as inhering in work of the character provided for in the plans and specifications. ( 6 ) It is further agreed that any modifications of the contract...